Mike tore out the Styrofoam insulation in the hunter’s shed. Electricity is turned on. Got the permit for the metal shed. Need to get the site graded.
I put down black plastic to solarize beds in the East Propagation Field. Need to get one more roll of plastic. Have 6 beds laid out.